Certification Process FAQ

Understanding the certification process helps you prepare effectively and ensures smooth project execution. This FAQ covers what to expect when engaging our cleanroom testing and TAB services.

Contact us to discuss your project requirements. We'll need information about: facility type and size, cleanroom classifications required, applicable standards (ISO, GMP, etc.), current status (new construction or existing facility), timeline requirements, and any specific concerns. After this initial consultation, we provide a detailed proposal including scope, schedule, and pricing.

For optimal testing results: ensure HVAC systems are fully operational and stable for at least 24-48 hours, complete all construction and cleaning activities, verify all HEPA filters are properly installed, confirm pressure relationships are established, ensure access to all areas including plenum spaces, have design documents and specifications available, and confirm personnel for system operation if needed. We'll provide a detailed pre-testing checklist specific to your project.

Our technicians arrive with calibrated equipment and begin with a site walkthrough to verify readiness. Testing proceeds systematically through each area, typically starting with HEPA filter integrity testing, then airflow measurements, particle counting, and finally pressure and environmental readings. We document everything in real-time and can provide preliminary results before leaving. Any issues found are immediately communicated so corrective actions can begin.

Failures are more common than you might think and are part of the qualification process. When issues are found, we document the specific failure with location and magnitude, provide analysis of likely causes, recommend corrective actions, and schedule retest after repairs. Common issues include HEPA filter leaks (easily repaired with sealant), damper adjustment needs, and pressure balance issues. We work with you to resolve problems efficiently.

Certification validity depends on regulatory requirements and company policies. ISO 14644-2 provides recommended maximum intervals between tests (6-24 months depending on classification and parameter). Pharmaceutical GMP typically requires annual requalification. However, certification can be invalidated by significant changes (HVAC modifications, filter replacements, construction) or if monitoring shows adverse trends. We recommend establishing a testing schedule based on your regulatory requirements and risk assessment.

Our technicians are certified by recognized industry bodies including TABB for TAB services. For cleanroom testing, they have training in ISO 14644 standards and pharmaceutical GMP requirements. All technicians participate in continuing education programs and proficiency testing. Equipment is calibrated to NIST-traceable standards with current calibration certificates. We maintain comprehensive quality management systems to ensure consistent service delivery.

Our comprehensive reports include: executive summary with pass/fail determination, detailed test methodology referencing applicable standards, all raw data and calculations, room layouts showing sample locations, equipment list with calibration status, results compared to specifications, trending against previous tests if available, photographs of installations and any deficiencies, non-conformance reports with remediation recommendations, and certificates of compliance. Reports are provided in PDF format with hard copies available.

Yes, we offer annual service agreements that provide: scheduled periodic testing at agreed intervals, priority scheduling for urgent needs, consistent pricing with no surprises, dedicated account management, trending and comparison reporting over time, consultation on changes and improvements, and reduced rates for additional services. Many clients find annual agreements provide better value and ensure compliance requirements are consistently met.

Our pricing is competitive for the level of expertise and documentation we provide. We believe in transparent pricing with detailed proposals showing exactly what's included. While some providers may offer lower prices, they may not include comprehensive documentation, certified technicians, or equipment with current calibration. We're happy to explain our pricing and the value we provide. Request a proposal and we'll provide a detailed breakdown for your specific requirements.

Absolutely. We frequently collaborate with HVAC contractors during commissioning and troubleshooting. As an independent testing firm, we provide objective verification while the contractor handles adjustments and repairs. This separation maintains testing integrity while ensuring efficient problem resolution. We communicate findings clearly to contractors and can participate in coordination meetings to ensure smooth project execution.